Site logo
Calendar IconSunday, June 7, 2026
  • Home
  • All News
  • Crime & Security
  • Politics
  • Sports
  • Oil & Gas
  • Business
  • Education
  • MORE
    • Health
    • Agriculture
    • Entertainment
    • Regional
    • Features
    • Letters
    • Advertise
    • Trending
    • Video
  • facebook-black
  • instgram-black
  • tiktok-black
  • twitter-black
  • youtube-black
  • Home
  • Advertise
  • Get The App
  • Contact Us
Categories
  • All News
  • Sports
  • Crime & Security
  • Politics
  • Oil & Gas
  • Business
  • Education
  • Health
  • Agriculture
  • Regional
  • Features
  • Letters
  • Top Stories
  • Social
  • Classifieds
  • Culture
  • Entertainment
  • Environment
  • International
  • Top Story
  • Video
  • facebook-black
  • instgram-black
  • tiktok-black
  • twitter-black
  • youtube-black
Search Icon
Calendar IconSunday, June 7, 2026
  • facebook-black
  • instgram-black
  • tiktok-black
  • twitter-black
  • youtube-black
  • HomeHome
  • TrendingTrending
  • VideoVideo
  • ContactContact Us
  • Home
  • Politics
  • Completion of repairs to damaged submarine cable slated for mid-November;spate of black outs in Bartica being addressed

    Completion of repairs to damaged submarine cable slated for mid-November;spate of black outs in Bartica being addressed

    Politics
    September 15, 2016
    Completion of repairs to damaged submarine cable slated for mid-November;spate of black outs in Bartica being addressed
    Completion of repairs to damaged submarine cable slated for mid-November;spate of black outs in Bartica being addressed
    FacebookTwitterPinterestEmailPrintWhatsAppRedditTelegramLinkedIn
    HandInHand-Top_Article-728x90

    Addressing matters related to the Guyana Power and Light Company, Public Infrastructure minister, David Patterson explained today that the submarine cable, which spans from Vreed-en-Hoop in region three to the Demerara grid, was damaged while work was being done; however, the cause has not been ascertained.

     

    Patterson  said the damaged cable, which has resulted in spates of black outs, brings excess power from the Vreed-en-Hoop station in region three and puts it on the Demerara interconnected grid.

     

    The Minister informed that GPL has raised the cable and identified the breakage, which requires the acquisition of a splicer. Three quotations have been acquired in this regard and a contractor has been identified, but this is awaiting official approval, the Minister said. Completion of repairs is anticipated for mid-November, since it would take 45 days for the splicer to arrive in Guyana.

     

    The repair of the cable, the Minister noted will be completed in three phases. Phase one which entails the laying of the cable is complete. Phase two involves the splicing and the third re-burying of the cable.

     

    Addressing the speculations regarding the re-burying of the cable, Patterson said according to his understanding, the original contract required it to be buried at a depth of three meters and MARAD had advised that it be placed lower, since they want to proceed with the dredging of channels. This Minister was advised that there is excess cable at both ends and at a convenient time, at the expense of the Company responsible, the cable would be buried further, at a depth of no less that six meters, Patterson highlighted.

     

    In addition, the Ministry is currently addressing the irregular electricity service being experienced in Bartica, region seven. To this, Minister Patterson has apologized to the residents there.

     

    It was revealed that three engines are slated for the town; however, one of these was recently taken off for overhauling. During this overhauling process, one of the two remaining engines developed a fault, thus leading to an insufficient supply of electricity.

     

    As an interim measure, a set from Onverwagt has been relocated to Bartica and according to the Ministry; rehabilitation of the overhauled engine is slated for completion by this weekend.

     

    Further, $1.5M is being spent to rent a piece of land to accommodate the temporary set and due to urgency, Patterson said the need for land was not publicly advertised.

     

    Related Articles

    Sidebar – Top Ad

    Recent Posts

    Sidebar – Bottom Ad
    JUNE 2026
    MON
    TUE
    WED
    THU
    FRI
    SAT
    SUN
    1
    2
    3
    4
    5
    6
    7
    8
    9
    10
    11
    12
    13
    14
    15
    16
    17
    18
    19
    20
    21
    22
    23
    24
    25
    26
    27
    28
    29
    30

    Subscribe to News Room for email updates on the latest posts.

    By subscribing, you accepted Our Policy

    Site logo

    News Room is a news outlet launched in 2016 and caters to persons interested in creative and intelligent journalism with a broad perspective. We are a daily news broadcast on E-Networks channel, E1, and our stories are also distributed via the devices closest at hand: mobile phones and tablets.

    Quick links

    • Home
    • All News
    • Crime & Security
    • Politics
    • Health
    • Letters
    • Sports
    • Oil & Gas
    • Business
    • Education
    • Agriculture
    • Features
    • Entertainment
    • Regional
    • Advertise
    • Get The App
    • Contact Us
    • Trending

    © 2026 Copyrights by News Room. All Rights Reserved.

    • facebook-black
    • instgram-black
    • tiktok-black
    • twitter-black
    • youtube-black
    • Privacy Policy
    • Term & Conditions